Updated on 08/28/24 as of 7:40 AM
Dates are posted once available, check back here often for updates.
2024 Contractor: Asphalt Paving Systems, Inc. (APS)
Work Hours: Any schedule posted is dependent on weather and equipment breakdowns. Work will be conducted between the hours of 7:00 AM - 5:00 PM. Temporary “No Parking” signs will be posted by our Highway Department at least three (3) days before the actual work starts.
Resident Notification: A letter will be mailed explaining this paving process and providing approximate dates for the work to be completed on each street. Please click here to view a pdf copy of the mailed letter. The contractor will place door hangers on your home two (2) days prior to the paving being done on your street.
2024 Ralumac Program Streets & Schedule
Street |
From |
To |
Ralumac Re-Surfacing |
Glenecho Lane |
Kirks Lane |
Cul-de-Sac |
Completed |
Lafayette Avenue |
Wischman Avenue |
Pennsylvania Avenue |
Completed |
Lincoln Avenue |
Avenue H |
Penn Avenue |
Completed |
Linden Avenue |
Pennsylvania Avenue |
409 Linden Avenue |
Completed |
Madison Avenue |
Montgomery Avenue |
Spring Avenue |
Completed |
Manor Place |
Garden Road |
Mill Road |
Completed |
Mundock Road |
Susquehanna Road |
Limekiln Pike |
Completed |
Penns Lane |
Norristown Road |
Harner Drive |
Completed |
Temple Drive |
Meetinghouse Road |
Bell Lane |
Completed |
Waldheim Drive |
Clinton Drive |
Penns Lane |
Completed |
Resident Access & Road Closures
Although work may not be done on your particular street until later in the day, you are strongly encouraged to make sure that your automobiles are moved out of your driveways and off your street before 7:00 AM.
If you need to get into or out of your driveway during the time that work is in progress, particularly when work is being done directly in front of your house, there may be a wait time of a few hours so that the material has time to properly cure.
The contractor and the Township will do everything we can to reduce the inconvenience to our residents during this paving project and we ask for your patience and cooperation.
If there are unusual circumstances that warrant special consideration for driveway access, please contact the Upper Dublin Township Public Works Department as soon as possible.
About Ralumac Program
Ralumac® micro-surfacing is a cost-effective preventive maintenance technique for renewing surfaces and protecting pavements. A quick, economical surface treatment for asphalt and PCC, micro-surfacing provides a smooth, black, highly textured and durable pavement surface that can last from 6 to 9 years (depending on application and project conditions).
Townships use micro-surfacing as part of their preventive maintenance programs, for rut filling, and for texturing their moderate to heavy volume roads--over both asphalt and concrete pavements.
Ralumac is applied by contractors using self-contained mixing and laying equipment. The equipment continuously blends the separately loaded components in a job mix formula. It can be applied in a thin lift, it sets quickly, and the road can be reopened to traffic in about an hour.
When applying the Ralumac to the road surfaces, the contractor must overlap his paving passes to get full coverage. Depending on the width of the street, two or three passes may be required. This process causes ridges to appear at overlaps and will leave a gritty appearance immediately following application, which is perfectly normal. In a relatively short period of time, traffic will wear down any irregularities in the paving surface leaving it smooth and virtually impervious.